GrubVetter

Gyu-Kaku Restaurant

1364 W RANDOLPH ST, 60607

Restaurant

P

Last inspected: January 12, 2026

Inspection History

January 12, 2026
Complaint
Pass
P
38INSECTS, RODENTS, & ANIMALS NOT PRESENT
49NON-FOOD/FOOD CONTACT SURFACES CLEAN
51PLUMBING INSTALLED; PROPER BACKFLOW DEVICES
55PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
June 26, 2025
Canvass
Pass w/ Conditions
PC
2CITY OF CHICAGO FOOD SERVICE SANITATION CERTIFICATE
55PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
57ALL FOOD EMPLOYEES HAVE FOOD HANDLER TRAINING
March 12, 2024
Canvass Re-Inspection
Pass
P
March 11, 2024
Canvass
Fail
F
50HOT & COLD WATER AVAILABLE; ADEQUATE PRESSURE
55PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
March 28, 2023
Complaint
Pass
P
47FOOD & NON-FOOD CONTACT SURFACES CLEANABLE, PROPERLY DESIGNED, CONSTRUCTED & USED
49NON-FOOD/FOOD CONTACT SURFACES CLEAN
53TOILET FACILITIES: PROPERLY CONSTRUCTED, SUPPLIED, & CLEANED
55PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
56ADEQUATE VENTILATION & LIGHTING; DESIGNATED AREAS USED
February 14, 2023
Complaint Re-Inspection
Pass
P
49NON-FOOD/FOOD CONTACT SURFACES CLEAN
53TOILET FACILITIES: PROPERLY CONSTRUCTED, SUPPLIED, & CLEANED
55PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
February 6, 2023
Complaint
Fail
F
10ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE
49NON-FOOD/FOOD CONTACT SURFACES CLEAN
53TOILET FACILITIES: PROPERLY CONSTRUCTED, SUPPLIED, & CLEANED
55PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
60PREVIOUS CORE VIOLATION CORRECTED
June 13, 2022
Canvass Re-Inspection
Pass
P
52SEWAGE & WASTE WATER PROPERLY DISPOSED
55PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
58ALLERGEN TRAINING AS REQUIRED
June 8, 2022
Canvass
Fail
F
10ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE
22PROPER COLD HOLDING TEMPERATURES
33PROPER COOLING METHODS USED; ADEQUATE EQUIPMENT FOR TEMPERATURE CONTROL
35APPROVED THAWING METHODS USED
52SEWAGE & WASTE WATER PROPERLY DISPOSED
55PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
58ALLERGEN TRAINING AS REQUIRED
July 28, 2021
Canvass
Pass
P
51PLUMBING INSTALLED; PROPER BACKFLOW DEVICES
53TOILET FACILITIES: PROPERLY CONSTRUCTED, SUPPLIED, & CLEANED