GrubVetter

The Liberty Hotel

215 Charles St, 02114

Eating & Drinking

P

Last inspected: February 10, 2026

Inspection History

February 10, 2026
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
February 10, 2026
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
February 2, 2026
Fail — Re-inspection Required
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
February 2, 2026
Fail — Re-inspection Required
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
January 31, 2026
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
January 31, 2026
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
November 21, 2025
Pass
P
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
November 21, 2025
Pass
P
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
November 17, 2025
Fail
F
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
November 17, 2025
Fail
F
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
May 14, 2024
Pass
P
590.005/5-205.11-PFUsing a Handwashing Sink-Operation and Maintenance (Pf)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
May 14, 2024
Pass
P
590.005/5-205.11-PFUsing a Handwashing Sink-Operation and Maintenance (Pf)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
May 10, 2024
Fail
F
590.005/5-205.11-PFUsing a Handwashing Sink-Operation and Maintenance (Pf)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
May 10, 2024
Fail
F
590.005/5-205.11-PFUsing a Handwashing Sink-Operation and Maintenance (Pf)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
January 3, 2024
Inspection Not Required
N
January 3, 2024
Inspection Not Required
N
July 18, 2023
Pass
P
July 18, 2023
Pass
P
February 21, 2023
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
February 21, 2023
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
January 18, 2023
Inspection Not Required
N
January 18, 2023
Inspection Not Required
N
January 17, 2023
Fail — Re-inspection Required
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
January 17, 2023
Fail — Re-inspection Required
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
December 14, 2022
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
December 14, 2022
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
July 25, 2022
Pass
P
July 25, 2022
Pass
P
June 13, 2022
Inspection Not Required
N
June 13, 2022
Inspection Not Required
N
March 15, 2022
Inspection Not Required
N
March 15, 2022
Inspection Not Required
N
August 6, 2021
Pass
P
August 6, 2021
Pass
P