Cambria Hotel
6 W Broadway, 02127
Eating & Drinking
P
Last inspected: January 13, 2026
Inspection History
January 13, 2026
Pass
P
590.002(C)/2-102.12-C(A) Certified Food Protection Manager (C)
590.003/3-501.17-PFReady-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
590.006/6-501.14-CCleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
January 13, 2026
Pass
P
590.002(C)/2-102.12-C(A) Certified Food Protection Manager (C)
590.003/3-501.17-PFReady-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
590.006/6-501.14-CCleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
January 6, 2026
Fail
F
590.002(C)/2-102.12-C(A) Certified Food Protection Manager (C)
590.003/3-501.17-PFReady-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
590.006/6-501.14-CCleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
January 6, 2026
Fail
F
590.002(C)/2-102.12-C(A) Certified Food Protection Manager (C)
590.003/3-501.17-PFReady-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
590.006/6-501.14-CCleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
September 15, 2025
Pass
P
September 15, 2025
Pass
P
March 21, 2025
Pass
P
March 21, 2025
Pass
P