GrubVetter

Sam Adams Deck/Rf Roof

4 Jersey St, 02215

Eating & Drinking

P

Last inspected: April 3, 2026

Inspection History

April 3, 2026
Pass
P
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
April 3, 2026
Pass
P
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
April 3, 2026
Pass
P
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
April 3, 2026
Pass
P
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
March 27, 2026
Fail
F
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
March 27, 2026
Fail
F
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-501.111-PFControlling Pests (Pf)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
September 18, 2025
Pass
P
September 18, 2025
Pass
P
April 10, 2025
Pass
P
590.006/6-501.111-PFControlling Pests (Pf)
April 10, 2025
Pass
P
590.006/6-501.111-PFControlling Pests (Pf)
April 4, 2025
Pending Hearing
N
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.005/5-202.12-PFHandwashing Sinks Installation (Pf)
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-301.11-PFHandwashing Cleanser Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
590.006/6-501.111-PFControlling Pests (Pf)
April 4, 2025
Pending Hearing
N
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.005/5-202.12-PFHandwashing Sinks Installation (Pf)
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-301.11-PFHandwashing Cleanser Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
590.006/6-501.111-PFControlling Pests (Pf)
April 1, 2025
Fail
F
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.005/5-202.12-PFHandwashing Sinks Installation (Pf)
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-301.11-PFHandwashing Cleanser Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
590.006/6-501.111-PFControlling Pests (Pf)
April 1, 2025
Fail
F
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.005/5-202.12-PFHandwashing Sinks Installation (Pf)
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-301.11-PFHandwashing Cleanser Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
590.006/6-501.111-PFControlling Pests (Pf)
April 18, 2024
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
April 18, 2024
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
April 9, 2024
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
April 9, 2024
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
January 3, 2024
Inspection Not Required
N
January 3, 2024
Inspection Not Required
N
March 30, 2023
Pass
P
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
March 30, 2023
Pass
P
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
March 27, 2023
Fail
F
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
March 27, 2023
Fail
F
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
January 18, 2023
Inspection Not Required
N
January 18, 2023
Inspection Not Required
N
October 5, 2022
Pass
P
590.006/6-201.16-CWall and Ceiling Coverings and Coatings (C)
590.006/6-202.11-CLight Bulbs Protective Shielding (C)
October 5, 2022
Pass
P
590.006/6-201.16-CWall and Ceiling Coverings and Coatings (C)
590.006/6-202.11-CLight Bulbs Protective Shielding (C)
September 30, 2022
Fail
F
590.006/6-201.16-CWall and Ceiling Coverings and Coatings (C)
590.006/6-202.11-CLight Bulbs Protective Shielding (C)
September 30, 2022
Fail
F
590.006/6-201.16-CWall and Ceiling Coverings and Coatings (C)
590.006/6-202.11-CLight Bulbs Protective Shielding (C)
April 15, 2022
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
April 15, 2022
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
April 4, 2022
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
April 4, 2022
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-501.13-CCleaning Floors Dustless Methods (C)
March 15, 2022
Inspection Not Required
N
March 15, 2022
Inspection Not Required
N
April 2, 2021
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-301.11-PFHandwashing Cleanser Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
L1
April 2, 2021
Pass
P
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-301.11-PFHandwashing Cleanser Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
L1
March 29, 2021
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-301.11-PFHandwashing Cleanser Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
L1
March 29, 2021
Fail
F
590.005/5-205.15-CSystem Maintained in Good Repair (C)
590.006/6-301.11-PFHandwashing Cleanser Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
L1