N.U. Stetson Hall West
11 Speare Pl, 02115
Eating & Drinking
P
Last inspected: March 12, 2026
Inspection History
March 12, 2026
Pass
P
590.004/4-501.111-PManual Warewashing Equipment Hot Water Sanitization Temperatures (P)
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
March 12, 2026
Pass
P
590.004/4-501.111-PManual Warewashing Equipment Hot Water Sanitization Temperatures (P)
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
February 26, 2026
Fail
F
590.004/4-501.111-PManual Warewashing Equipment Hot Water Sanitization Temperatures (P)
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
February 26, 2026
Fail
F
590.004/4-501.111-PManual Warewashing Equipment Hot Water Sanitization Temperatures (P)
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
September 24, 2025
Filed
F
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
September 24, 2025
Filed
F
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
February 11, 2025
Pass
P
590.004/4-502.11-C(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
February 11, 2025
Pass
P
590.004/4-502.11-C(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
January 30, 2025
Fail
F
590.004/4-502.11-C(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
January 30, 2025
Fail
F
590.004/4-502.11-C(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
October 18, 2024
Pass
P
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
October 18, 2024
Pass
P
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
October 4, 2024
Fail — Re-inspection Required
F
590.004/4-101.11-CCharacteristics-Materials for Construction and Repair (C)
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
October 4, 2024
Fail — Re-inspection Required
F
590.004/4-101.11-CCharacteristics-Materials for Construction and Repair (C)
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
September 19, 2024
Fail
F
590.004/4-101.11-CCharacteristics-Materials for Construction and Repair (C)
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
September 19, 2024
Fail
F
590.004/4-101.11-CCharacteristics-Materials for Construction and Repair (C)
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
February 6, 2024
Filed
F
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
February 6, 2024
Filed
F
590.004/4-901.11-CEquipment and Utensils Air-Drying Required (C)
October 4, 2023
Filed
F
590.004/4-501.11-CGood Repair and Proper Adjustment-Equipment (C)
590.006/6-501.112-CRemoving Dead or Trapped Birds Insects Rodents and other Pest (C)
October 4, 2023
Filed
F
590.004/4-501.11-CGood Repair and Proper Adjustment-Equipment (C)
590.006/6-501.112-CRemoving Dead or Trapped Birds Insects Rodents and other Pest (C)
March 2, 2023
Pass
P
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.004/4-501.11-CGood Repair and Proper Adjustment-Equipment (C)
March 2, 2023
Pass
P
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.004/4-501.11-CGood Repair and Proper Adjustment-Equipment (C)
February 22, 2023
Fail
F
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.004/4-501.11-CGood Repair and Proper Adjustment-Equipment (C)
February 22, 2023
Fail
F
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.004/4-501.11-CGood Repair and Proper Adjustment-Equipment (C)
October 4, 2022
Pass
P
590.004/4-502.11-C(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
October 4, 2022
Pass
P
590.004/4-502.11-C(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
September 21, 2022
Fail
F
590.004/4-502.11-C(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
September 21, 2022
Fail
F
590.004/4-502.11-C(A) and (C) Good Repair and Calibration-Utensils and Temperature and Pressure Measuring Devices (C)
March 15, 2022
Inspection Not Required
N
March 15, 2022
Inspection Not Required
N
February 1, 2022
Pass
P
February 1, 2022
Pass
P
September 21, 2021
Pass
P
September 21, 2021
Pass
P
January 26, 2021
Pass
P
January 26, 2021
Pass
P