GrubVetter

Fresh Fuel At Granby Commons

213 Bay State Rd, 02215

Eating & Drinking

P

Last inspected: February 11, 2026

Inspection History

February 11, 2026
Pass
P
February 11, 2026
Pass
P
September 16, 2025
Filed
F
590.006/6-202.15-COuter Openings Protected (C)
September 16, 2025
Filed
F
590.006/6-202.15-COuter Openings Protected (C)
February 13, 2025
Pass
P
February 13, 2025
Pass
P
October 24, 2024
Filed
F
590.003/3-302.15-PFWashing Fruits and Vegetables (Pf)
590.003/3-307.11-CMiscellaneous Sources of Contamination (C)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-101.11-CSurface Characteristics-Indoor Areas (C)
590.007/7-102.11-PFCommon Name-Working Containers (Pf)
October 24, 2024
Filed
F
590.003/3-302.15-PFWashing Fruits and Vegetables (Pf)
590.003/3-307.11-CMiscellaneous Sources of Contamination (C)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-101.11-CSurface Characteristics-Indoor Areas (C)
590.007/7-102.11-PFCommon Name-Working Containers (Pf)
October 17, 2024
Fail
F
590.003/3-302.15-PFWashing Fruits and Vegetables (Pf)
590.003/3-307.11-CMiscellaneous Sources of Contamination (C)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-101.11-CSurface Characteristics-Indoor Areas (C)
590.007/7-102.11-PFCommon Name-Working Containers (Pf)
October 17, 2024
Fail
F
590.003/3-302.15-PFWashing Fruits and Vegetables (Pf)
590.003/3-307.11-CMiscellaneous Sources of Contamination (C)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-101.11-CSurface Characteristics-Indoor Areas (C)
590.007/7-102.11-PFCommon Name-Working Containers (Pf)
May 21, 2024
Pass
P
590.003/3-501.16-P1(A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.005/5-203.14-PBackflow Prevention Device When Required (P)
590.004/4-501.15-CWarewashing Machines Manufacturers’ Operating Instructions (C)
May 21, 2024
Pass
P
590.003/3-501.16-P1(A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.005/5-203.14-PBackflow Prevention Device When Required (P)
590.004/4-501.15-CWarewashing Machines Manufacturers’ Operating Instructions (C)
May 9, 2024
Fail
F
590.003/3-501.16-P1(A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.005/5-203.14-PBackflow Prevention Device When Required (P)
590.004/4-501.15-CWarewashing Machines Manufacturers’ Operating Instructions (C)
May 9, 2024
Fail
F
590.003/3-501.16-P1(A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.005/5-203.14-PBackflow Prevention Device When Required (P)
590.004/4-501.15-CWarewashing Machines Manufacturers’ Operating Instructions (C)
January 3, 2024
Inspection Not Required
N
January 3, 2024
Inspection Not Required
N
February 9, 2023
Pass
P
590.003/3-307.11-CMiscellaneous Sources of Contamination (C)
590.004/4-204.112-PFTemperature Measuring Devices-Functionality (Pf)
590.005/5-103.11-PFCapacity-Quantity and Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
February 9, 2023
Pass
P
590.003/3-307.11-CMiscellaneous Sources of Contamination (C)
590.004/4-204.112-PFTemperature Measuring Devices-Functionality (Pf)
590.005/5-103.11-PFCapacity-Quantity and Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
January 25, 2023
Fail
F
590.003/3-307.11-CMiscellaneous Sources of Contamination (C)
590.004/4-204.112-PFTemperature Measuring Devices-Functionality (Pf)
590.005/5-103.11-PFCapacity-Quantity and Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
January 25, 2023
Fail
F
590.003/3-307.11-CMiscellaneous Sources of Contamination (C)
590.004/4-204.112-PFTemperature Measuring Devices-Functionality (Pf)
590.005/5-103.11-PFCapacity-Quantity and Availability (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
January 18, 2023
Inspection Not Required
N
January 18, 2023
Inspection Not Required
N
October 25, 2022
Pass
P
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
October 25, 2022
Pass
P
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
October 3, 2022
Fail
F
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
October 3, 2022
Fail
F
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
May 12, 2022
Pass
P
May 12, 2022
Pass
P
March 15, 2022
Inspection Not Required
N
March 15, 2022
Inspection Not Required
N
April 27, 2021
Pass
P
April 27, 2021
Pass
P