Tatte Bakery & Cafe
201 Washington St, 02108
Eating & Drinking
P
Last inspected: January 20, 2026
Inspection History
January 20, 2026
Pass
P
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-PFControlling Pests (Pf)
January 20, 2026
Pass
P
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-PFControlling Pests (Pf)
January 12, 2026
Fail
F
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-PFControlling Pests (Pf)
January 12, 2026
Fail
F
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-PFControlling Pests (Pf)
November 6, 2025
Pass
P
November 6, 2025
Pass
P
September 10, 2025
Pass
P
September 10, 2025
Pass
P
January 9, 2025
Pass
P
January 9, 2025
Pass
P
April 26, 2024
Pass
P
April 26, 2024
Pass
P
March 13, 2024
Pass
P
March 13, 2024
Pass
P
September 20, 2023
Pass
P
590.004/4-301.14-CVentilation Hood Systems Adequacy (C)
September 20, 2023
Pass
P
590.004/4-301.14-CVentilation Hood Systems Adequacy (C)
September 6, 2023
Fail — Re-inspection Required
F
590.003/3-501.14-PCooling (P)
590.004/4-301.14-CVentilation Hood Systems Adequacy (C)
September 6, 2023
Fail — Re-inspection Required
F
590.003/3-501.14-PCooling (P)
590.004/4-301.14-CVentilation Hood Systems Adequacy (C)
September 1, 2023
Fail
F
590.003/3-501.14-PCooling (P)
590.004/4-301.14-CVentilation Hood Systems Adequacy (C)
September 1, 2023
Fail
F
590.003/3-501.14-PCooling (P)
590.004/4-301.14-CVentilation Hood Systems Adequacy (C)
April 5, 2023
Filed
F
590.003/3-305.11-CFood Storage-Preventing Contamination from the Premises (C)
April 5, 2023
Filed
F
590.003/3-305.11-CFood Storage-Preventing Contamination from the Premises (C)
January 18, 2023
Inspection Not Required
N
January 18, 2023
Inspection Not Required
N
December 7, 2022
Filed
F
590.003/3-304.14-CWiping Cloths Use Limitation (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
December 7, 2022
Filed
F
590.003/3-304.14-CWiping Cloths Use Limitation (C)
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
April 5, 2022
Filed
F
590.004/4-501.11-CGood Repair and Proper Adjustment-Equipment (C)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-501.114-CMaintaining Premises Unnecessary Items and Litter (C)
April 5, 2022
Filed
F
590.004/4-501.11-CGood Repair and Proper Adjustment-Equipment (C)
590.004/4-602.13-CNonfood Contact Surfaces (C)
590.006/6-501.114-CMaintaining Premises Unnecessary Items and Litter (C)
March 15, 2022
Inspection Not Required
N
March 15, 2022
Inspection Not Required
N
December 23, 2021
Pass
P
December 23, 2021
Pass
P
September 24, 2021
Pass
P
590.004/4-204.112-PFTemperature Measuring Devices-Functionality (Pf)
September 24, 2021
Pass
P
590.004/4-204.112-PFTemperature Measuring Devices-Functionality (Pf)
September 16, 2021
Fail
F
590.004/4-204.112-PFTemperature Measuring Devices-Functionality (Pf)
September 16, 2021
Fail
F
590.004/4-204.112-PFTemperature Measuring Devices-Functionality (Pf)