GrubVetter

Center Stage @ Emerson

116 Boylston St, 02116

Eating & Drinking

P

Last inspected: January 21, 2026

Inspection History

January 21, 2026
Pass
P
590.005/5-205.15-PSystem Maintained in Good Repair (P)
L1
January 21, 2026
Pass
P
590.005/5-205.15-PSystem Maintained in Good Repair (P)
L1
January 15, 2026
Fail
F
590.005/5-205.15-PSystem Maintained in Good Repair (P)
L1
January 15, 2026
Fail
F
590.005/5-205.15-PSystem Maintained in Good Repair (P)
L1
October 21, 2025
Pass
P
590.003/3-305.14-CFood Preparation (C)
October 21, 2025
Pass
P
590.003/3-305.14-CFood Preparation (C)
October 14, 2025
Fail — Re-inspection Required
F
590.003/3-305.14-CFood Preparation (C)
October 14, 2025
Fail — Re-inspection Required
F
590.003/3-305.14-CFood Preparation (C)
October 7, 2025
Fail
F
590.003/3-305.14-CFood Preparation (C)
October 7, 2025
Fail
F
590.003/3-305.14-CFood Preparation (C)
March 17, 2025
Pass
P
March 17, 2025
Pass
P
November 13, 2024
Pass
P
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
November 13, 2024
Pass
P
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
November 5, 2024
Fail
F
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
November 5, 2024
Fail
F
590.006/6-201.11-CFloors Walls and Ceilings-Cleanability (C)
September 4, 2024
Pass
P
September 4, 2024
Pass
P
January 3, 2024
Inspection Not Required
N
January 3, 2024
Inspection Not Required
N
February 2, 2023
Pass
P
February 2, 2023
Pass
P
January 18, 2023
Inspection Not Required
N
January 18, 2023
Inspection Not Required
N
November 15, 2022
Pass
P
590.004/4-501.114-PManual and Mechanical Warewashing Equipment Chemical Sanitization-Temperature pH Concentration and Hardness (P)
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
L1
November 15, 2022
Pass
P
590.004/4-501.114-PManual and Mechanical Warewashing Equipment Chemical Sanitization-Temperature pH Concentration and Hardness (P)
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
L1
October 27, 2022
Fail
F
590.004/4-501.114-PManual and Mechanical Warewashing Equipment Chemical Sanitization-Temperature pH Concentration and Hardness (P)
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
L1
October 27, 2022
Fail
F
590.004/4-501.114-PManual and Mechanical Warewashing Equipment Chemical Sanitization-Temperature pH Concentration and Hardness (P)
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
L1
June 13, 2022
Inspection Not Required
N
June 13, 2022
Inspection Not Required
N
March 15, 2022
Inspection Not Required
N
March 15, 2022
Inspection Not Required
N
November 16, 2021
Pass
P
November 16, 2021
Pass
P
April 29, 2021
Pass
P
April 29, 2021
Pass
P