Blake's Boston
280 Friend St, 02114
Eating & Drinking
P
Last inspected: April 22, 2026
Inspection History
April 22, 2026
Pass
P
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-CControlling Pests (C)
April 22, 2026
Pass
P
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-CControlling Pests (C)
April 3, 2026
Fail — Re-inspection Required
F
590.002(D)/2-103.11-PF(A)-(P) Person-In-Charge-Duties (Pf)
590.003/3-501.17-PFReady-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.004/4-303.11-PFCleaning Agents and Sanitizers Availability (Pf)
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-CControlling Pests (C)
590.006/6-501.12-CCleaning Frequency and Restrictions (C)
590.006/6-501.14-CCleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
April 3, 2026
Fail — Re-inspection Required
F
590.002(D)/2-103.11-PF(A)-(P) Person-In-Charge-Duties (Pf)
590.003/3-501.17-PFReady-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.004/4-303.11-PFCleaning Agents and Sanitizers Availability (Pf)
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-CControlling Pests (C)
590.006/6-501.12-CCleaning Frequency and Restrictions (C)
590.006/6-501.14-CCleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
March 26, 2026
Fail
F
590.002(D)/2-103.11-PF(A)-(P) Person-In-Charge-Duties (Pf)
590.003/3-501.17-PFReady-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.004/4-303.11-PFCleaning Agents and Sanitizers Availability (Pf)
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-CControlling Pests (C)
590.006/6-501.12-CCleaning Frequency and Restrictions (C)
590.006/6-501.14-CCleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
March 26, 2026
Fail
F
590.002(D)/2-103.11-PF(A)-(P) Person-In-Charge-Duties (Pf)
590.003/3-501.17-PFReady-To-Eat Time/Temperature Control for Safety Food Date Marking (Pf)
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.004/4-303.11-PFCleaning Agents and Sanitizers Availability (Pf)
590.004/4-501.112-PFMechanical Warewashing Equipment Hot Water Sanitization Temperatures (Pf)
590.006/6-202.15-COuter Openings Protected (C)
590.006/6-501.111-CControlling Pests (C)
590.006/6-501.12-CCleaning Frequency and Restrictions (C)
590.006/6-501.14-CCleaning Ventilation Systems Nuisance and Discharge Prohibition (C)
September 3, 2025
Pass
P
September 3, 2025
Pass
P
October 18, 2024
Pass
P
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.004/4-301.11-PFCooling Heating and Holding Capacities-Equipment (Pf)
October 18, 2024
Pass
P
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.004/4-301.11-PFCooling Heating and Holding Capacities-Equipment (Pf)
October 2, 2024
Fail
F
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.004/4-301.11-PFCooling Heating and Holding Capacities-Equipment (Pf)
October 2, 2024
Fail
F
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.004/4-301.11-PFCooling Heating and Holding Capacities-Equipment (Pf)
June 4, 2024
Pass
P
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
June 4, 2024
Pass
P
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
May 21, 2024
Fail — Re-inspection Required
F
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
May 21, 2024
Fail — Re-inspection Required
F
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
May 15, 2024
Fail
F
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
May 15, 2024
Fail
F
590.003/3-501.16-P(A)(2) and (B) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.003/3-501.15-PF(A )Cooling Methods (Pf)
October 20, 2023
Pass
P
October 20, 2023
Pass
P
July 24, 2023
Pass
P
590.003/3-501.16-P1(A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.004/4-601.11-PF(A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)
590.006/6-501.18-CCleaning of Plumbing Fixtures (C)
July 24, 2023
Pass
P
590.003/3-501.16-P1(A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.004/4-601.11-PF(A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)
590.006/6-501.18-CCleaning of Plumbing Fixtures (C)
July 17, 2023
Fail
F
590.003/3-501.16-P1(A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.004/4-601.11-PF(A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)
590.006/6-501.18-CCleaning of Plumbing Fixtures (C)
July 17, 2023
Fail
F
590.003/3-501.16-P1(A)(1) Time/Temperature Control for Safety Food Hot and Cold Holding (P)
590.004/4-601.11-PF(A) Equipment Food-Contact Surfaces Nonfood-Contact Surfaces and Utensils (Pf)
590.006/6-501.18-CCleaning of Plumbing Fixtures (C)
November 17, 2022
Pass
P
590.004/4-602.13-CNonfood Contact Surfaces (C)
November 17, 2022
Pass
P
590.004/4-602.13-CNonfood Contact Surfaces (C)
November 10, 2022
Fail
F
590.004/4-602.13-CNonfood Contact Surfaces (C)
November 10, 2022
Fail
F
590.004/4-602.13-CNonfood Contact Surfaces (C)
August 2, 2022
Pass
P
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.006/6-301.14-CHandwashing Signage (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
August 2, 2022
Pass
P
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.006/6-301.14-CHandwashing Signage (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
July 26, 2022
Fail
F
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.006/6-301.14-CHandwashing Signage (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
July 26, 2022
Fail
F
590.004/4-302.14-PFSanitizing Solutions Testing Devices (Pf)
590.006/6-301.14-CHandwashing Signage (C)
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
March 15, 2022
Inspection Not Required
N
March 15, 2022
Inspection Not Required
N
September 29, 2021
Pass
P
September 29, 2021
Pass
P
June 29, 2021
Filed
F
590.004/4-204.115-PFWarewashing Machines Temperature Measuring Devices (Pf)
590.004/4-204.119-CWarewashing Sinks and Drain boards Self-Draining (C)
590.004/4-602.11-CEquipment Food-Contact Surfaces and Utensils-Frequency (C)
June 29, 2021
Filed
F
590.004/4-204.115-PFWarewashing Machines Temperature Measuring Devices (Pf)
590.004/4-204.119-CWarewashing Sinks and Drain boards Self-Draining (C)
590.004/4-602.11-CEquipment Food-Contact Surfaces and Utensils-Frequency (C)
June 14, 2021
Fail
F
590.004/4-204.115-PFWarewashing Machines Temperature Measuring Devices (Pf)
590.004/4-204.119-CWarewashing Sinks and Drain boards Self-Draining (C)
590.004/4-602.11-CEquipment Food-Contact Surfaces and Utensils-Frequency (C)
June 14, 2021
Fail
F
590.004/4-204.115-PFWarewashing Machines Temperature Measuring Devices (Pf)
590.004/4-204.119-CWarewashing Sinks and Drain boards Self-Draining (C)
590.004/4-602.11-CEquipment Food-Contact Surfaces and Utensils-Frequency (C)