Hue - 1St Fl
47 Huntington Av, 02116
Eating & Drinking
P
Last inspected: November 6, 2025
Inspection History
November 6, 2025
Pass
P
590.002/2-301.14-PWhen to Wash (P)
590.003/3-701.11-PDiscarding or Reconditioning Unsafe Adulterated or Contaminated Food (P)
590.005/5-205.11-PFUsing a Handwashing Sink-Operation and Maintenance (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
590.006/6-301.14-CHandwashing Signage (C)
November 6, 2025
Pass
P
590.002/2-301.14-PWhen to Wash (P)
590.003/3-701.11-PDiscarding or Reconditioning Unsafe Adulterated or Contaminated Food (P)
590.005/5-205.11-PFUsing a Handwashing Sink-Operation and Maintenance (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
590.006/6-301.14-CHandwashing Signage (C)
October 31, 2025
Fail
F
590.002/2-301.14-PWhen to Wash (P)
590.003/3-701.11-PDiscarding or Reconditioning Unsafe Adulterated or Contaminated Food (P)
590.005/5-205.11-PFUsing a Handwashing Sink-Operation and Maintenance (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
590.006/6-301.14-CHandwashing Signage (C)
October 31, 2025
Fail
F
590.002/2-301.14-PWhen to Wash (P)
590.003/3-701.11-PDiscarding or Reconditioning Unsafe Adulterated or Contaminated Food (P)
590.005/5-205.11-PFUsing a Handwashing Sink-Operation and Maintenance (Pf)
590.006/6-301.12-PFHand Drying Provision (Pf)
590.006/6-301.14-CHandwashing Signage (C)
October 31, 2024
Inspection Not Required
N
October 31, 2024
Inspection Not Required
N
October 23, 2024
Pass
P
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
L1
October 23, 2024
Pass
P
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
L1
October 17, 2024
Fail
F
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
L1
October 17, 2024
Fail
F
590.006/6-501.11-CRepairing-Premises Structures Attachments and Fixtures-Methods (C)
L1